CN EN

Engineering Application

ENGINEER

sale@c86m.com

General AC line
Released:2021-08-03

220kV Jialong 43T1, Luolong 43R6 line is an important line for energy transmission to the green petrochemical base on Yushan Island, Zhoushan, which is the world's largest single industrial project in terms of investment, as well as a key national strategic project. Zhoushan Power Supply Company has been committed to strengthening the construction of island power grid lines and intelligent operation and maintenance, making every effort to ensure power supply for the base, and creating an demonstration of whole industry chain services of oil and gas. Safeguarding the safe and reliable power supply of Yushan green petrochemical base will better serve the faster development of China's petrochemical industry and marine economy.

In July 2018, our transmission line distributed fault diagnostic system was applied to 220kV Jialong 43T1, Luolong 43R6 line double circuit line. The system can quickly determine the fault interval, clarify operation and maintenance responsibilities, locate the fault point, guide rapid emergency repairs, effectively shorten the time of power outage due to line faults, reduce the loss of transmission capacity caused by power outages, and provide guarantees for the rapid recovery of power supply.

 

image.png

 

Qingmin line, Fufeng line, and Huaibei Line are typical AC 220kV trans-area transmission lines, which are all under the jurisdiction of Fuzhou Power Supply Company, and are an important part of the Fuzhou power grid. Due to the zoning management of urban power lines and the increasing complexity of the lines, the fault tripping rate is correspondingly high. In order to realize the rapid diagnosis of line faults, our company's distributed fault diagnosis device has been installed and applied on transmission lines such as the Qingmin Line, Fufeng Line, and Huaibei Line. Since its application, this system has made great contributions to the stable operation and fault handling of the lines, especially in providing important reference basis for zoning responsibility management, fault positioning, fault cause identification, and line renovation of transmission lines.

 

image.png

 


 

Partial application lines:

Ø 500kV Dongsan line I, II, III

Ø 500kV Sutian 5252 line

Ø 500kV Yaowu Line

Ø 330kV Taole Line

220kV Jialong 43T1 and Luolong 43R6 double circuit lines

Ø 220kV Qingmin Line

Ø 220kV Fufeng Line

Ø 220kV Huaibei Line

Ø 220kV Bo traction line I, II

Ø 220kV Nuclear Power Generation Line I, II
       Ø 220kV Shayang line I, II

Ø 220kV Jinghe Line

Ø 110kV Pufeng Line

Ø 110kV Zecao Line

Ø 110kV Zihu Line

Ø 110kV Shengli Line

Ø 110kV Wangjun lines I, II

Ø 110kV Sunhai Line

Ø 110kV Baizhong Line

Ø 110kV Ula Line

Ø 66kV Lin Ma Yi Line

Ø 66kV Guanggong line A and B

Ø 66kV Beiyuan Line

Ø 66kV Ma Hei Line

 

 

 

previous article:important channel

next article:High-voltage cable lines

Official phones Business phones O&M phones 0086-027-87420702 0086-13277695881 400-027-0051

Address:Weilai zhi guang Industry Park,No. 3 Guanggu Boulevard, East Lake High-tech Development Zone,Wuhan City, Hubei Province,China.

COPYRIGHT ©2016Wuhan Sunshine Power Technology Co., LTD. All Rights Reserved

Technical Support:

网站地图